新航道 - 用心用情用力做教育!
咨询热线:400-011-8885
投诉电话:400-097-9266
AI客服 精准解答您的学习规划问题

《剑14》Test 3 小作文范文解析,制作工序的流程图咋写?

2019-05-20    浏览:85     来源:新航道官网
免费咨询热线:400-011-8885

      今天,给同学们分享《剑14》Test 3 的小作文范文及解析,搬好小板凳,来看鸭~

  《剑14》Test 3 小作文:流程图

微信图片_20190520095520.jpg

  范文及解析

  The diagram is an illustration of how electrical power is produced in hydraulic electricity power plant.

  [上来就是一个重要的点:不要按照图面上的进展顺序(从左到右)来,而是仔细观察图面后发现,其实这个发电厂的工作分成“白班” (Day)和“晚班”(Night).] The power station works two shifts – the morning shift and the night shift. [句话提示读者,作者的信息分组方式:“白班”(Day)和“晚班”(Night).]During the day, electricity is generated. The dam obstructs the river’s waterflow and creates a reservoir at a height [这是可数名词:“高处”]. At the bottom of the dam is a point of entry, open during the day, and water isinjected, through it, into the tube [对于图中不明确的空间的理解], reaching the reversible turbines and turning them. [理解图中的文字信息从而理解工作原理,而不直接用图中给出的文字信息去措辞] With the turbines spinning, the generator isactivated and produces electrical power. As soon as electricity is produced, it is transmitted to the national grid. Meanwhile, water does not stay in thechamber [对于图中不明确的空间的理解] where the turbines are placed and instead enters the low-level reservoir.

  [流程图的词汇重点在于动词:obstruct, create, inject, spin, activate, transmit]

  The night shift works in reverse [固定词组:“相反地”]. Water is pumped back via the daytime route, and it is noticeable that water does not flow through at the intake point, which is closed at night.

  Overall, the plant works around the clock, and the whole process is a rather simple cycle.

推荐阅读:

雅思写作怎么复习才能取得!

雅思小作文 | 只有8个数字的表格题该咋写?

雅思写作提分技巧汇总!

2019年3月9日雅思大作文真题参考范文


版权及免责声明
1.本网站所有原创内容(文字、图片、视频等)版权归新航道国际教育集团所有。未经书面授权,禁止任何形式的复制、转载或商用,违者将依法追究法律责任。本网站部分内容来源于第三方,转载仅为信息分享,不代表新航道观点,转载时请注明原始出处,并自行承担版权责任。
2.本网站内容仅供参考,不构成任何决策依据,用户应独立判断并承担使用风险,新航道不对内容的准确性、完整性负责,亦不承担因使用本网站内容而引发的任何直接或间接损失。
3.如涉及版权问题或内容争议,请及时与我们联系,电话:400-011-8885。
资料下载
手机号:
验证码: